Grading Permit Bond - City of Tustin, CA in California

Brief Summary

Tustin does not publish a single bond amount for grading. The Building Official sets the figure for your project when the permit is issued, so the fastest path is to have the plan check numbers in hand and get a surety bond quoted against that exact amount. A bond keeps your cash free for the job instead of tied up in a city deposit.

Under Tustin City Code Section 8918, the Building Official may require a bond or other security from a grading permit applicant, in a form and amount the Building Official decides is necessary. The bond backs the promise that work not finished to the approved plans will be corrected to remove hazards, and it can also cover water quality and construction hours enforcement costs and repair of City streets damaged while hauling import or export soil.

We can help with all California bonds!

How to Apply for a Grading Permit Bond:

  • Submit the grading plans and checklist items through the City of Tustin Citizen Self Service portal.
  • Include the Engineer's Cost Estimate, signed and stamped by the Engineer of Work.
  • Pay the plan check fee set by City Council resolution when the application is accepted.
  • Get the required bond amount and form from the Building Official after plan check.
  • Have the surety issue the bond with the City of Tustin as obligee and deliver it before the permit is issued.
  • Pay the grading permit fee before issuance.

Detailed Information About the California Grading Permit Bond:

The amount is set for your project

Tustin grading bonds are not a fixed figure. Section 8918 of the Tustin City Code lets the Building Official require bonds or other security in such forms and amounts deemed necessary, and points to the City Grading Manual for bonding procedures. Section 8910 also allows bonding to be attached as a permit condition. In practice the number comes out of plan check for your site, so get it from the City before you request the bond.

What the bond guarantees

The code lists the purposes plainly. The security assures that work not completed in line with the approved plans and specifications will be corrected to eliminate hazardous conditions. It can also recover the City's cost for water quality enforcement and construction hours enforcement. Under Section 8917, separate security can be required to guarantee maintenance and repair of City streets damaged while moving import and export material.

Who needs a grading permit in the first place

Section 8906 requires a permit before any grading, clearing, brushing or grubbing that prepares a site for grading. Common exemptions include excavation for footings and basements covered by a valid building permit, small cuts and fills that stay under 50 cubic yards and meet the depth and slope limits in the code, exploratory soil borings, utility trenching by franchised utilities, and resurfacing of existing pavement. Paving over 3,000 square feet for a private road, parking lot or driveway does need a grading permit unless the Building Official waives it in writing, and so does altering a watercourse.

Timing

A Tustin grading permit expires if work does not start within 180 days, if work stops for 180 days, or if the job is not finished within one year unless the permit or an improvement agreement says otherwise. A change of ownership before the grading is complete voids the permit and a new one is required, which usually means a new bond in the new owner's name.

Eligibility and Requirements for a California Grading Permit Bond:

  • Bond amount as set by the Tustin Building Official for the specific project.
  • City of Tustin named as obligee.
  • Principal name matching the permit applicant or property owner on the grading application.
  • Surety admitted to write bonds in California.
  • Separate street repair security when the Building Official or Public Works Director requires it for import or export hauling.

California Grading Permit Bond FAQs:

How much is the Tustin grading bond?

There is no single published figure. Tustin City Code Section 8918 lets the Building Official set the amount needed for each project, with procedures in the City Grading Manual. Ask the Building Division for the amount once plan check is done.

What does the bond cover?

Correction of grading work that does not follow the approved plans so hazardous conditions are removed, plus the City's costs for water quality and construction hours enforcement. Street damage from hauling soil can be covered by separate security under Section 8917.

Does my small project need a grading permit?

Maybe not. Section 8906 exempts several categories, including footing and basement excavation under a building permit and small cuts or fills under 50 cubic yards that stay within the depth and slope limits. The Building Official makes the final call.

What happens if the property sells mid project?

The grading permit expires on a change of ownership if the grading is not finished. The new owner needs a new permit, and the City will expect security posted in the new owner's name.

How is the premium set?

The surety prices the bond from the bond amount and a review of the applicant's credit and finances. Larger amounts or weaker credit cost more. You get a firm quote once the City gives you the amount.

Official and Additional Resources for the California Grading Permit Bond:

Grading Permit in Other California Locations

City of Beverly Hills, CACity of Chino Hills, CACity of Glendale, CACity of Hemet, CACity of Lake Forest, CACity of Los Angeles, CACity of Poway, CACity of Santa Clarita, CAOrange County, CASausalito, CA

All City of Tustin, CA bonds · All California surety bonds