Santa Clarita prices the grading bond off your earthwork quantities, so a small precise grade job may need no bond at all while a mass grading project can run well into six figures. Knowing the formula before plan check lets you line up the surety bond early instead of holding the permit for it.
The City of Santa Clarita can require grading security under Section 17.84.010 of its Unified Development Code for any grading over 1,000 cubic yards, and for smaller jobs where unusual conditions or special hazards exist. The amount is based on cubic yards of cut or fill, whichever is greater, plus the cost of drainage and protective devices. The City's current calculation sheet drops the bond requirement when the total comes to less than $20,000.
We can help with all California bonds!
Under UDC Section 17.84.010, the security is based on the number of cubic yards of excavation or fill, whichever is greater, plus the cost of drainage or other protective devices, retaining walls and work needed to eliminate geotechnical hazards. The City Engineer estimates those costs.
The Engineering Services Division's grading fee and bond calculation sheet, with fees effective August 24, 2026, applies a rate of $2.7352 per cubic yard for the first 100,000 cubic yards and $1.3624 per cubic yard above that, then adds the engineer's drainage device cost estimate. If the result is under $20,000, the sheet shows no grading bond required.
The City Engineer may waive security for grading done in or for a government agency, grading to remove a geological hazard already covered by an agreement and security, grading on a site no steeper than 3 to 1 that will not affect drainage to or from neighbors, and filling holes or depressions that will not affect drainage.
The code calls for a bond from a corporate surety authorized to do business in California. Other security needs the City Engineer's prior written approval. The City Engineer may require up to 10 percent of the security as a cash deposit, which the City can use for erosion, dust and sediment control. Use the City's own Grading Bond form, payable to the City of Santa Clarita, with all signatures acknowledged.
The bond runs from filing until the City Engineer approves the completed grading. Once rough grading is done, the City Engineer may agree to a proportionate reduction. The calculation sheet lists a $284 bond processing fee and a $206 annual bond renewal fee. If the work goes into default, the surety stays bound up to the full bond amount for the City's cost to finish it.
It depends on earthwork volume. The City's current sheet uses $2.7352 per cubic yard up to 100,000 cubic yards and $1.3624 per cubic yard after that, plus drainage device costs.
The code allows security for grading over 1,000 cubic yards, or less where special hazards exist. The City's sheet shows no bond when the computed amount is under $20,000.
Yes. After rough grading is complete, the City Engineer may consent to a proportionate reduction to cover the remaining work.
The surety rates it on the bond amount, the owner or contractor's credit and finances, and experience with similar grading work.
This website is a referral and marketing platform that connects users with licensed insurance agents. We do not issue surety bonds directly except in states where we are licensed. All bond applications are processed and fulfilled by licensed agents. By using this site, you agree to our Terms & Conditions, Privacy Policy, and the use of cookies. If you do not agree, please exit the site.