In Poway the grading security is due after the plans are approved and before the City Engineer signs them, so the bond is usually the last thing holding up the preconstruction meeting. Having a surety bond lined up early keeps the project on schedule and keeps cash free for the grading contractor.
The City of Poway requires grading securities to be posted once grading plans are approved and before the City Engineer's approval, together with inspection fees based on the final cost estimate. The bond amount is not a fixed figure. It is built from the engineer's cost estimate priced with the city's unit price list, plus a 10 percent contingency, rounded up to the next $100.
We can help with all California bonds!
Poway requires a grading permit before grading on any project that involves excavation of two feet or more with slopes steeper than 2:1, moving 50 cubic yards or more, changing drainage patterns, or work within open space or easement areas. A grading plan prepared by a qualified professional engineer is required.
On an already developed parcel, minor landscaping or recreational grading can be done without a permit if it stays at least 10 feet from structures and three feet from property lines, totals no more than 250 cubic yards, is no deeper than three vertical feet, creates no cut or fill slope over five feet high or steeper than 3:1, does not alter drainage at the property line, and stays out of easements and areas where structures are planned. Miss any one condition and the permit, and the security, apply.
The city's Master Fee Schedule includes an Engineering Division unit price list used to calculate project valuations for deposit and security requirements. Its note says cost estimates for bonding and securities include a 10 percent contingency added to the construction estimate, with the total rounded up to the next $100. Your engineer's approved cost estimate drives the final number, so the bond amount is specific to each project.
The Grading Plans Submittal Checklist lists grading securities among the items required before the City Engineer approves the plans, along with the mylar, plan check fees and inspection fees based on the final cost estimate. The grading permit itself carries a $465 fee under the current fee schedule. After approval you schedule the preconstruction meeting. Confirm the bond form and filing steps with the Land Development Engineering Division before the bond is issued.
The City of Poway is the obligee. The bond guarantees the permittee completes the approved grading, drainage and erosion control work to city standards. If the work is abandoned or left unsafe, the city can claim against the bond to finish or stabilize the site.
It depends on the project. The amount comes from your engineer's cost estimate priced with the city's unit price list, plus a 10 percent contingency, rounded up to the next $100.
After the grading plans are approved in plan check and before the City Engineer signs them. Securities are listed on the city's submittal checklist alongside the inspection fees.
Not if it is minor landscaping or recreational grading on a developed parcel and meets every exemption condition, including no more than 250 cubic yards, no more than three feet deep and setbacks from structures and property lines.
The Land Development Engineering Division at 858-668-4655.
The surety sets the premium as a percentage of the bond amount after reviewing the principal's credit and finances and the size of the job.
This website is a referral and marketing platform that connects users with licensed insurance agents. We do not issue surety bonds directly except in states where we are licensed. All bond applications are processed and fulfilled by licensed agents. By using this site, you agree to our Terms & Conditions, Privacy Policy, and the use of cookies. If you do not agree, please exit the site.