Surety Bond Encyclopedia

Construction Right of Way Bond - City of Saginaw, TX in Texas

Brief Summary

Saginaw does not print a single bond figure for right-of-way work. Section 86-33 of the City Code lets the city require a performance bond in advance of a street excavation, and the amount is set for the job in front of it. Once you have that number from the city, the bond itself is a quick filing. You pay a premium instead of tying up cash, and the executed bond goes in with your right-of-way permit so the work can be scheduled.

The City of Saginaw, Texas may require a performance bond before it allows excavation or other construction work in a public street, alley or right-of-way. Saginaw City Code Section 86-33 makes it unlawful to dig or excavate in a public street without a permit, requires the permit holder to restore the street surface to its original condition, and authorizes the city to require the bond in advance to guarantee that work. The city sets the bond amount for the permit, so confirm the figure and the current bond form with the City of Saginaw before the bond is issued.

We can help with all Texas bonds!

How to Apply for a Construction Right of Way Bond:

  • Register as a right-of-way contractor with the City of Saginaw and pay the $150.00 registration fee.
  • Complete the Right of Way Permit Application through the city's GovWell portal, attaching construction or site plans where they apply.
  • Get the required bond amount and any required bond form from the City of Saginaw Building Inspections and Permits office.
  • Complete the bond application with the contractor's legal name exactly as it appears on the permit application.
  • Pay the premium and receive the executed performance bond naming the City of Saginaw as obligee.
  • Submit the bond with the permit, schedule the work as the city directs, and restore the street surface to its original condition when finished.

Detailed Information About the Texas Construction Right of Way Bond:

What the bond guarantees

Saginaw regulates work in its streets under Chapter 86 of the City Code, Streets, Sidewalks and Other Public Places. Section 86-33 makes it unlawful for any person to intentionally or wilfully damage the surface of a public street or alley, or to dig or excavate in one, without a permit. The work must be done at the time and in the manner the city directs, and when it is finished the person who made the excavation must restore the street surface to its original condition. The same section states that the city may require a performance bond in advance to guarantee the proper performance of the work.

The bond protects the City of Saginaw. If the contractor leaves a cut unrepaired or does not restore the pavement as required, the city can make a claim against the bond to recover the cost of finishing the job.

How the amount is set

The code does not fix a dollar figure. The city sets the bond amount as part of reviewing the permit, so two contractors working on different streets can be asked for different amounts. Get the required amount and any city bond form from the Building Inspections and Permits office before you apply for the bond.

Related permits and exemptions

Section 86-1 separately requires a permit from the city secretary before anyone lays, builds, repairs or rebuilds a sidewalk, curb, gutter or driveway on or next to a public street. Under Section 86-6, the city council may also require a bond in advance for a driveway built across a drainage ditch.

Section 86-34 exempts public utility companies from the excavation permit for construction, maintenance or repair of their own facilities. They still have to restore the surface to its original condition and notify the chief of police when an excavation will stay open overnight, with safeguards to warn the traveling public. Private contractors working for a utility should confirm with the city whether the exemption reaches their work.

Fees and a second bond people miss

The city's Master Fee Schedule, adopted by Ordinance 2026-25 on August 11, 2026, lists a Right-of-Way Contractor Registration fee of $150.00 and a Public Works Inspection Fee of $300.00 per hour. The same schedule calls for maintenance bonds on public improvements equal to 100% of the cost of the improvement for two years after construction is complete. That maintenance bond is a separate instrument tied to development projects and does not take the place of the right-of-way bond.

Eligibility and Requirements for a Texas Construction Right of Way Bond:

  • City of Saginaw, Texas named as obligee.
  • Bond amount as set by the city for the specific permit.
  • Surety company authorized to write bonds in Texas.
  • Principal name matching the contractor registration and permit application.
  • Underwriting review of the contractor's credit and, for larger amounts, business financials. These shape the premium rate.

Texas Construction Right of Way Bond FAQs:

How much is the Saginaw right-of-way bond?

Saginaw City Code Section 86-33 authorizes a performance bond but does not set a fixed dollar amount. The city sets the amount when it reviews your permit. Ask the Building Inspections and Permits office for the figure before you apply for the bond.

Do utility companies need the permit and bond?

Section 86-34 exempts public utility companies from the excavation permit for construction, maintenance or repair. They must still restore the street surface and notify the chief of police about excavations left open overnight. Contractors working on a utility's behalf should confirm their status with the city.

Is this the same as the maintenance bond on the fee schedule?

No. The Master Fee Schedule lists a maintenance bond equal to 100% of the cost of a public improvement for two years after construction. That applies to development projects. The right-of-way bond guarantees the permitted street work and restoration.

How is the premium set?

The surety prices the bond from the bond amount the city requires and an underwriting review of the contractor, mainly credit history and, on larger bonds, business financials and experience. You see the quote before you pay.

Where do I file?

Right-of-way permits go through the City of Saginaw Building Inspections and Permits office, 333 West McLeroy Blvd, Saginaw, TX 76179, phone 817-232-4640. The permit application is available through the city's GovWell portal.

Official and Additional Resources for the Texas Construction Right of Way Bond:

Other City of Saginaw, TX Surety Bonds in Texas

Peddler, Solicitor, Itinerant Vendor ($1,000)

Construction Right of Way in Other Texas Locations

City of DeSoto, TX

All Texas Right of Way bonds · All City of Saginaw, TX bonds · All Texas surety bonds