Fiber builders who pull INDOT broadband permits one after another file this bond once and keep working. The rule sets the blanket floor at $500,000, so the question is not whether you need that much but whether your open permits have pushed you past it. Bond at the right level and new permits keep issuing. Paying a premium keeps that $500,000 out of your build budget.
Under 105 IAC 16-1-7, a broadband operator must have a bond before INDOT issues a broadband access permit. A blanket bond has a minimum of $500,000, and the operator must increase it as needed so it covers the total project costs of all open permits. If those costs exceed the blanket amount, INDOT issues no new permits until the bond is increased or permits are closed. The bond is written on the INDOT Blanket Bond for Right-of-Way Permits with Broadband Access checked, names the State of Indiana as obligee, and the notarized original is mailed to INDOT Permits in Indianapolis.
We can help with all Indiana bonds!
105 IAC 16-1-7 is INDOT's broadband bond rule. For a single permit, the operator can post a performance bond of $10,000 for up to 5,000 feet, or $10,000 per mile, or the total project costs for installation in INDOT's right of way, whichever is greater. For a blanket bond the minimum is $500,000. That is where most operators stop reading, and it is where they get caught. The same subsection requires the operator to increase the blanket bond as needed to cover the total project costs of all open permits, and it bars INDOT from issuing new permits once those costs exceed the bond until the bond is increased or permits are closed. A build program that grows mid season needs a bond rider before the next permit, not after.
The rule and INDOT's Broadband Permit Guidelines both require the surety to be in the name of the company, and the guidelines say the company that owns the fiber optic cable. If the incorporated name changes for any reason, the bond has to be updated. 105 IAC 16-1-2 defines an operator broadly, to include any broadband service provider, contractor, subcontractor, consultant or affiliated party constructing, operating, providing or installing fiber optic cable. A contractor placing fiber for a carrier should confirm with INDOT whose blanket bond backs each permit before work starts.
Under 105 IAC 16-1-6, a broadband access agreement must be fully executed by the operator and INDOT and approved by the state approving agencies before any permit issues, and no work may be done in INDOT right of way without both a valid permit and that agreement. INDOT's guidelines add that installing fiber along the routes on INDOT's Broadband Corridor requires a fully executed Broadband Corridor Agreement first. The corridor program comes from IC 8-23-5-10, the dig once broadband corridor statute for limited access highway right of way.
INDOT's Public Permit Guide sorts broadband permits into six subtypes: New Vertical Structure, State-Owned Vertical Structure, State Facility, Longitudinal Fiber, Transverse Fiber, and Other for access to modify and maintain shared use improvements. Each application carries a $55 nonrefundable fee under INDOT's broadband checklist. As-built plans are submitted after the permitted work is complete.
Blanket bonds are not delivered to district offices. The hard copy, with original signatures and notary seals on all three pages, is mailed to INDOT Permits, 100 N. Senate Ave., N758-Permits, Indianapolis, IN 46204, and a PDF copy goes into the Electronic Permit System. Under the form, the bond takes effect on the later of its stated effective date and the date INDOT accepts it and enters it into EPS.
The broadband checklist lets qualifying applicants file State Form 35483R, the Bond and/or Permit Fee Waiver. The Public Permit Guide identifies schools, churches and local governments as the entities that may qualify.
The minimum. 105 IAC 16-1-7 requires the blanket bond to be increased as needed to cover the total project costs of all open permits. Once those costs exceed the bond, INDOT will not issue new permits until you increase it or close permits.
A single broadband performance bond runs $10,000 for up to 5,000 feet, $10,000 per mile, or total project cost, whichever is greater, one permit at a time. Operators with several permits open at once generally file the blanket bond so each new permit does not need its own bond.
INDOT's guidelines say the surety must be in the name of the company that owns the fiber optic cable, and the permit application must be in the name of the company responsible for installing and maintaining it.
Not by itself. Under 105 IAC 16-1-6 you also need a fully executed broadband access agreement, and a valid permit, before any work in INDOT right of way.
Mail the original to INDOT Permits, 100 N. Senate Ave., N758-Permits, Indianapolis, IN 46204 and upload a PDF in EPS. Release is requested by emailing the Bond Release Information Request Form to permits@indot.in.gov.
This website is a referral and marketing platform that connects users with licensed insurance agents. We do not issue surety bonds directly except in states where we are licensed. All bond applications are processed and fulfilled by licensed agents. By using this site, you agree to our Terms & Conditions, Privacy Policy, and the use of cookies. If you do not agree, please exit the site.