Brief Summary

Woonsocket will not issue a water or sewer excavation permit until the permit bond is in place, and the city sets the amount job by job. Knowing how that number is figured, and how long the bond stays open after the work is accepted, keeps a connection job from stalling at the permit counter.

The City of Woonsocket Department of Public Works requires a permit bond before it issues a permit to excavate in the public right of way or on private property, which includes water service and sewer connections. The Director of Public Works sets the amount for each permit based on the cost of proper restoration. The bond runs to the City and is released one year after the work is accepted.

We can help with all Rhode Island bonds!

How to Apply for a Water & Sewer Permit Bond:

  • Contact the Woonsocket Engineering Division for the bond amount the Director sets for your permit.
  • Confirm the work will be performed by a Rhode Island Master Plumber or Rhode Island Licensed Underground Utility Contractor.
  • Obtain the permit bond naming the City of Woonsocket, in the permittee's exact legal name.
  • Provide certificates of insurance meeting the Permit Manual minimums.
  • Apply for the excavation permit through the city's Permit Portal and attach license copies.
  • Complete roadway restoration within 120 days of finishing the work and keep the bond in force through the one year guarantee period.

Detailed Information About the Rhode Island Water & Sewer Permit Bond:

The amount is set for each permit

There is no single bond amount for a Woonsocket water or sewer permit. Section V of the city's Permit Manual, issued by the Department of Public Works Engineering Division, says the permittee shall deposit with the City a permit bond in an amount determined by the Director. The amount is set separately for each permit and computed on the basis of the cost required to make proper restoration or repairs. Ask the Engineering Division for the figure on your job before ordering the bond.

Contractors who pull permits often can deposit an annual escrow account with the City, acceptable to the Director, instead of buying a separate bond for every permit.

How long the bond stays open

The bond is released when the guarantee period ends, and the guarantee period is one year after the City accepts the work. During that year the permittee is responsible for restoration, repair and maintenance of the work. All roadway restoration in the permit must be finished within 120 days after the permitted work is complete. If that date falls between November 15 and April 1, the permittee has 30 days after roads open for construction. Missing the deadline can result in the bond being executed and future permits being put at risk.

Who posts it

The Permit Manual defines the permittee as the contractor, homeowner or property owner the permit is issued to. Water, sewer and storm work must be done by a Rhode Island Master Plumber or a Rhode Island Licensed Underground Utility Contractor, and copies of licenses go to the Engineering Division with the application. The permittee must also provide an OSHA competent person on site.

Insurance and application

The manual lists minimum insurance, including commercial general liability of $1,000,000 each occurrence and $2,000,000 general aggregate, automobile liability of $1,000,000 combined single limit, and statutory workers compensation. Excavation permits are now applied for through the city's online Permit Portal under the Engineering Department. A new water or sewer connection also requires a petition filed with the Engineering Division. Starting work before the permit is issued, other than in an emergency, brings a fine equal to the permit fee.

Eligibility and Requirements for a Rhode Island Water & Sewer Permit Bond:

  • Bond amount determined by the Director of Public Works based on restoration cost.
  • City of Woonsocket as obligee.
  • One year guarantee period after the City accepts the work.
  • Commercial general liability of $1,000,000 each occurrence and $2,000,000 aggregate, plus auto and workers compensation coverage.
  • An OSHA competent person on site.

Rhode Island Water & Sewer Permit Bond FAQs:

How much is the Woonsocket water and sewer permit bond?

The Director of Public Works sets it for each permit, based on the cost of proper restoration or repairs. Get the figure from the Engineering Division before applying for the bond.

Do I need a new bond for every permit?

Not if the City accepts an annual escrow account. The Permit Manual allows an annual escrow, acceptable to the Director, in place of individual bonds for each permit.

When is the bond released?

At the end of the guarantee period, which is one year after the City accepts the work. If the work does not include a permanent patch, the Director decides the guarantee period.

Can a homeowner pull the permit?

The Permit Manual defines the permittee as the contractor, homeowner or property owner the permit is issued to. Water and sewer work itself must be performed by a Rhode Island Master Plumber or Licensed Underground Utility Contractor.

What happens if restoration is late?

Roadway restoration is due within 120 days after the work is complete, with a 30 day window after roads reopen if the deadline falls between November 15 and April 1. Missing it can lead to the bond being executed and puts future permits at risk.

How is the premium set?

The surety charges a percentage of the bond amount based on the contractor's credit and experience. Confirm the current bond form with the Engineering Division before the bond is issued.

Official and Additional Resources for the Rhode Island Water & Sewer Permit Bond:

All Rhode Island Sewer bonds · All City of Woonsocket, RI bonds · All Rhode Island surety bonds