There is no standard price tag on a Pennsylvania mining bond. DEP sets the amount permit by permit at what it would cost the state to finish your reclamation, and no ground can be disturbed until DEP approves the bond. A surety bond lets you cover that number without tying up the full amount in cash or collateral.
The Pennsylvania Department of Environmental Protection will not issue a new, revised or renewed mining permit until the operator files a reclamation bond on a DEP form, payable to the Department, and DEP approves it (25 Pa. Code 86.143 for coal). The amount is the estimated cost to DEP of completing the reclamation, restoration and abatement work under the permit, calculated with DEP's annual bond rate guidelines. DEP guidance sets coal minimums of $10,000 for bituminous mines and $5,000 for anthracite mines.
We can help with all Pennsylvania bonds!
The biggest misunderstanding about this bond is the idea of a set amount. Under 25 Pa. Code 86.149, the standard DEP uses is the estimated cost to the Department if it had to complete the reclamation, restoration and abatement work required by the law, the regulations and the permit. DEP looks at the operation's size, topography, geology, water pollution risk, topsoil and proposed land use, the type of mining, road or stream relocation, shaft sealing, building removal, treatment facilities and subsidence correction, plus an allowance for cost changes over the preceding 5 years.
For coal permits, DEP publishes bond rate guidelines in the Pennsylvania Bulletin each year. Its conventional bonding guidance for coal (document 563-2504-001) says the total bond for a site is the sum of the costs for the component unit operations plus indirect costs, with mobilization and demobilization applied to every site. That same guidance sets the minimum bond at $10,000 for bituminous mines and $5,000 for anthracite mines. Noncoal operations are bonded under 25 Pa. Code Chapter 77, Subchapter D, with DEP using separate calculation methods for consolidated minerals, unconsolidated minerals and small operations.
Section 86.143 says no new, revised or renewed permit will be issued until the applicant files a bond on a DEP form, payable to the Department, and DEP approves it. An operator may not disturb surface acreage or extend underground workings before the bond is approved and the permit is issued. If more than one bond is filed for a permit, every bond applies to the entire permit area.
For coal surface mining, liability continues through mining and reclamation and for 5 years after the last revegetation work (25 Pa. Code 86.151). Underground mines carry liability for 5 years after operations and reclamation, longer for water pollution as DEP decides case by case, and 10 years after mining for subsidence from bituminous underground mines.
Under 86.157, the surety must be authorized to do business in Pennsylvania. The bond cannot be cancelled for nonpayment of premium or the permittee's bankruptcy during the liability period, the surety and permittee are jointly and severally liable, and the bond amount is confessed to judgment on forfeiture. On forfeiture, the surety may elect to perform the reclamation within 30 days of notice instead of paying.
DEP's Bureau of Mining Programs also runs a Land Reclamation Financial Guarantee program. Its limits are 50% of the required bond amount per permit and $3,000,000 per operator, with an annual fee of 1.5% of the guarantee. A separate Remining Financial Guarantee has a $170,000 permit limit and a $510,000 operator limit, with a 1% annual fee.
It depends on the permit. DEP sets the amount at what it would cost the Department to complete the reclamation, restoration and abatement work, using its annual bond rate guidelines for coal and separate methods for noncoal. DEP guidance sets the coal minimum at $10,000 for bituminous and $5,000 for anthracite mines.
No. Under 25 Pa. Code 86.143, you may not disturb surface acreage until DEP has approved the bond and issued a permit covering that acreage.
For coal surface mining, through mining and reclamation and for 5 years after the last revegetation work. Underground mines have their own periods, including 10 years after mining for subsidence from bituminous underground mines. The surety cannot cancel it for nonpayment of premium during that time.
Yes. Under 25 Pa. Code 86.145, DEP determines the bond for the permit area and adjusts the amount from time to time.
DEP's Land Reclamation Financial Guarantee program can cover up to 50% of the required bond amount for a permit, up to $3,000,000 per operator, for an annual fee of 1.5% of the guarantee. Ask DEP whether your operation qualifies.
This website is a referral and marketing platform that connects users with licensed insurance agents. We do not issue surety bonds directly except in states where we are licensed. All bond applications are processed and fulfilled by licensed agents. By using this site, you agree to our Terms & Conditions, Privacy Policy, and the use of cookies. If you do not agree, please exit the site.