The $5,000 figure is the floor, not the ceiling. Forest Grove sizes its right of way performance bond to the cost of the work in the street, with $5,000 as the minimum, and a surety bond covers that requirement for an annual premium instead of a cash deposit.
The City of Forest Grove requires a performance bond before a developer or contractor starts excavation work in the public right of way or a public easement. The bond must equal the cost of the construction improvements within the right of way, but never less than $5,000, and it carries a one year surety after the City accepts the work. The City of Forest Grove is the obligee.
We can help with all Oregon bonds!
Forest Grove's Engineering FAQ, which points to City Code section 151.047, says the performance bond must be equal to the amount of construction improvements within the right of way, but not less than $5,000. Small jobs such as a single drive approach or a short sidewalk section usually land at the $5,000 minimum. Larger public facility work will need a bond sized to the improvement cost.
An Excavation Permit is required for any work within the public right of way or easement that involves excavation. That includes installing concrete drive approaches or sidewalks, and connecting to or constructing public facilities. Developers and contractors must post the bond before starting work.
The City requires a one year surety after it accepts the work. Plan for the bond to stay in force through that warranty year, not just through construction. If the work fails or the street is not restored properly in that window, the City can make a claim against the bond.
The bond does not replace insurance. Before work starts the City also requires public liability insurance of at least $100,000 per person and $300,000 per accident, and property damage insurance of at least $100,000, with the City of Forest Grove named as an additional insured on both.
Submit improvement plans, the performance bond, proof of insurance and the permit application to the City Engineering office. The permit fee is set by Council resolution and listed on the Engineering fee schedule. Your bond premium is set by the surety based on the bond amount and the credit and experience of the contractor. Confirm the current bond form and filing steps with Forest Grove Engineering before the bond is issued.
No. $5,000 is the minimum. The bond must equal the cost of construction improvements within the right of way when that cost is higher.
Any work in the public right of way or easement that involves excavation, including concrete drive approaches, sidewalks, and connecting to or building public facilities.
Through construction and for one year after the City accepts the work.
No. The City also requires public liability and property damage insurance naming the City as an additional insured.
You pay a premium set by the surety based on the bond amount and the credit and track record of the contractor or developer.
This website is a referral and marketing platform that connects users with licensed insurance agents. We do not issue surety bonds directly except in states where we are licensed. All bond applications are processed and fulfilled by licensed agents. By using this site, you agree to our Terms & Conditions, Privacy Policy, and the use of cookies. If you do not agree, please exit the site.