Surety Bond Encyclopedia

Excavation Permit ($10,000) Bond - City of Joplin, MO in Missouri

Brief Summary

Joplin will not let anyone dig in a city street, alley or sidewalk area without a permit and a licensed contractor behind the work. The $10,000 excavation permit bond is the financial guarantee the City holds while the right of way is open. It is quick to issue, costs a small annual premium rather than a $10,000 cash deposit, and keeps your crew from waiting on paperwork.

The City of Joplin, Missouri requires a permit for any excavation in the public right of way, and the work must be performed by a licensed contractor. The Excavation Permit bond is a $10,000 surety bond naming the City of Joplin as obligee. It guarantees the City that the contractor will follow Joplin's rules for work in the right of way and restore what it disturbs. Right of way questions go to the Engineering Division at (417) 624-0820 ext. 530.

We can help with all Missouri bonds!

How to Apply for a Excavation Permit ($10,000) Bond:

  • Legal business name exactly as it appears on your City of Joplin contractor license.
  • Owner name, home address and Social Security number for the credit review.
  • Complete the bond application and review the quoted premium.
  • Pay the premium and receive the executed $10,000 bond naming the City of Joplin as obligee.
  • Confirm the bond form and filing steps with the Engineering Division at (417) 624-0820 ext. 530.
  • File the bond with your excavation permit before any digging in the right of way.

Detailed Information About the Missouri Excavation Permit ($10,000) Bond:

Any dig in the right of way needs a permit

The City of Joplin's own permit FAQ is blunt about it: any excavation in the public right of way requires a permit and must be performed by a licensed contractor. A property owner who needs a dig in the right of way has to hire a licensed contractor to do it.

What the bond does

The Excavation Permit bond is a $10,000 surety bond with the City of Joplin as obligee. The contractor who performs the excavation is the principal. The bond guarantees the City that the contractor will perform right of way work according to City requirements and pay for damage or unfinished restoration it leaves behind. If the City makes a valid claim, the surety pays up to $10,000 and the contractor repays the surety. The bond protects the City and the public, not the contractor.

Related Joplin requirements

Joplin separates several kinds of right of way work. Concrete work on city rights of way, such as sidewalks, curbs and driveway approaches, must be done by a licensed and bonded contractor and requires a permit and inspection. Building a driveway that connects to a City street requires its own permit. Contractor licenses are issued by the Finance Department at (417) 624-0820 ext. 242, and questions about private use of the public right of way go to the Engineering Division at ext. 530.

Before the bond is issued

Confirm the current bond form, the exact obligee wording and the filing steps with the Joplin Engineering Division before the bond is issued. Have the permit application in hand so the bond and the permit show the same contractor name.

How premium is set

The surety sets the premium from the owner's personal credit, the company's time in business and the $10,000 bond amount. Contractors with solid credit get the best rate.

Eligibility and Requirements for a Missouri Excavation Permit ($10,000) Bond:

  • A City of Joplin contractor license, issued through the Finance Department.
  • An excavation permit for any work in the public right of way.
  • Bond amount of $10,000 with the City of Joplin as obligee.
  • Contractor name on the bond matching the license and permit.
  • Owner credit review by the surety.

Missouri Excavation Permit ($10,000) Bond FAQs:

Do I need a permit to dig in the street or parkway in Joplin?

Yes. The City states that any excavation in the public right of way requires a permit and must be performed by a licensed contractor.

Who is the obligee on the bond?

The City of Joplin, Missouri. The contractor doing the excavation is the principal.

Can a homeowner do the digging?

No. Excavation in the public right of way must be performed by a licensed contractor, and the contractor is the one who posts this bond.

Who do I call about the permit?

The Engineering Division handles right of way questions at (417) 624-0820 ext. 530. Contractor licenses are handled by the Finance Department at ext. 242.

What does the bond cost?

The surety prices it from the owner's credit, the company's history and the $10,000 bond amount. Apply for an instant quote to see your rate.

Official and Additional Resources for the Missouri Excavation Permit ($10,000) Bond:

Other City of Joplin, MO Surety Bonds in Missouri

General Builder (Commercial Build & Remodel) - $10,000General Builder (Residential Build & Remodel) - $10,000Subcontractor License ($10,000)

All Missouri Excavation bonds · All City of Joplin, MO bonds · All Missouri surety bonds