Have a question?
+1 815-826-6324 (815-8-BondAI)
phil@AmericasSuretyBonds.com
Army Veteran Owned | Expert Surety Bonds Since 2004
The $500 figure most people quote for a Hobart right of way bond is only the floor. The City Engineer sets the actual amount for each job, and the bond has to stay in force for at least a year after the work is done and until every claim is settled. Knowing that before you price the job keeps a permit from stalling at the Clerk-Treasurer's window.
Hobart Code 94.23 requires anyone who cuts into, tunnels under or excavates a street, alley, pavement, berm, parkway or sidewalk to file a bond with the City Clerk-Treasurer before the permit is issued. The City Engineer sets the amount, never less than $500. The bond guarantees the work is done to the engineer's satisfaction and indemnifies the city against third party damage claims, and it must stay in force for at least one year after the work is completed.
We can help with all Indiana bonds!
Hobart Code 94.23(A) says the bond is in the amount the City Engineer determines, but in no case less than $500. The city's Street, Curb, Sidewalk, Alley, Bridge or Right of Way Permit Application asks for the estimated construction and restoration cost and has a blank for the required bond amount, which the engineer fills in at review. Expect a larger figure on bigger cuts and longitudinal work.
The bond promises that the permittee will faithfully perform the work in a manner satisfactory to the City Engineer. It also indemnifies the city against damages to third persons caused by negligence or improper work. Under 94.23(B), the permittee must keep the bond in force for at least one year after the work is completed, and the Clerk-Treasurer will not release it until all claims are settled.
Section 94.24 lets the engineer require an additional guarantee that cut or disturbed pavement will be properly replaced. That can be a cash deposit sized to the repair cost, forfeited if the repair is not made to the engineer's satisfaction within the permit time limit and in any case within 60 days. As an alternative, the permittee can file a second bond in an amount the engineer sets, guaranteeing the street, alley, bridge, curb or sidewalk is put back in as good condition as before.
Section 94.20 makes it unlawful for any person to cut into or tunnel under a street or alley, or through or across any pavement, berm, parkway or sidewalk, without a permit from the City Engineer, and 94.23 applies the bond to any person seeking that permit. Contractors, utility crews and property owners doing the work all fall under it.
Apply at least 48 hours before the excavation starts (94.21). Work must be completed within 60 days of the permit date unless the engineer extends it (94.26). Section 94.22 lists the application fee as $50 for a lateral cut and $100 for a longitudinal cut. The Engineering Department application form lists $50 per lateral excavation and $250 per longitudinal excavation, including borings, so confirm the current fee when you apply.
You pay the surety a premium, not the bond amount. It is based on the amount the engineer sets and on the applicant's credit and finances.
$500 is the minimum. Hobart Code 94.23 lets the City Engineer set any amount above that, and the city's permit application has a blank for the required bond amount next to the estimated restoration cost. Get the figure from the engineer before ordering the bond.
At least one year after the work is completed, and the City Clerk-Treasurer will not release it until the permittee has settled all claims. Plan on carrying the bond well past the end of the job.
Yes. Under 94.24 the engineer can require an additional guarantee that disturbed pavement will be replaced. That is a cash deposit sized to the repair, or a second bond in an amount the engineer sets.
Hobart Code 94.22 lists $50 for a lateral cut and $100 for a longitudinal cut. The Engineering Department's application form lists $50 per lateral excavation and $250 per longitudinal excavation, including borings. Confirm the current fee when you apply.
Apply at least 48 hours before the excavation starts. The work must be finished within 60 days of the permit date unless the City Engineer extends it.
This website is a referral and marketing platform that connects users with licensed insurance agents. We do not issue surety bonds directly except in states where we are licensed. All bond applications are processed and fulfilled by licensed agents. By using this site, you agree to our Terms & Conditions, Privacy Policy, and the use of cookies. If you do not agree, please exit the site.