Before you cut a curb, pour a driveway apron or open up a sidewalk in Macon-Bibb County, the county wants a $25,000 bond on file or an insurance policy that meets its exact terms. The bond is the simpler route for most contractors. It is one flat amount, it runs to Macon-Bibb County, and you pay a premium instead of tying up $25,000 of your own money.
Macon-Bibb County Code Sec. 24-78 requires a $25,000 bond, payable to Macon-Bibb County, from every contractor or other person who changes curbing to build or repair a driveway, builds or repairs a sidewalk, or does any work that disturbs the surface of a sidewalk or street. The amount is flat with no tiers. Contractors and plumbers may skip the bond by filing a qualifying liability policy with the county clerk instead. The work itself also needs a right-of-way permit from the county engineer.
We can help with all Georgia bonds!
This bond comes from Section 24-78 of the Macon-Bibb County Code of Ordinances, titled Contractor's bond required, adopted by Ord. No. O-15-0030 on July 21, 2015. It applies to every contractor or other person who:
The bond is $25,000. It is one flat figure. The ordinance sets no tiers by project size, license class or number of jobs.
The bond runs to Macon-Bibb County. It is conditioned on the work being done in accordance with the county's ordinances, rules and regulations, and on holding Macon-Bibb County harmless for any damage to person or property that arises from the work. The contractor or other person doing the work signs as principal. The surety must be authorized and qualified to do business in Georgia and in Macon-Bibb County.
Section 24-78 lets contractors and plumbers skip the bond entirely if they carry a liability policy with at least $25,000 of property damage coverage and $100,000 of personal injury coverage, and file a copy with the Macon-Bibb County clerk. The county will not accept just any general liability policy. It must include products hazard coverage, including completed operations liability, and the C.D.U. exclusions must be omitted. Many contractor policies carry those exclusions, so have your insurance agent check the policy before you rely on it. If your policy does not meet every term, you need the bond.
The bond does not replace the permit. Section 24-68 makes it unlawful for any person, franchisees included, to excavate, build on or under, or otherwise disturb the surface of any paved or unpaved street or sidewalk without first getting a permit from the Macon-Bibb County engineer. The Engineering Department posts a Right of Way Excavation/Occupation Application and Permit on its forms page. Permits expire at the end of the time allotted on the permit unless the county engineer grants an extension (Sec. 24-70), and the permit must be returned within three days after that time runs out (Sec. 24-71). The county will not issue a permit to anyone who still owes it for repairing excavated pavement (Sec. 24-69).
Section 24-136 gives the Director of Engineering discretion to require a performance bond before work begins on, in, over or under the public right-of-way. That bond is sized by the county's risk manager to cover completing the work or restoring the right-of-way to its prior condition. It is separate from the $25,000 bond, and a large project can trigger both.
The premium is a fraction of the $25,000 bond amount, set by the surety after it reviews the owner's personal credit and the company's history. Stronger credit and a clean claims record mean a lower rate. The county does not set the price.
The code does not state a bond filing fee, a bond term, a renewal date or a numbered county bond form. Ask the Engineering Department whether it wants the bond on a county form and where it should be delivered before you have it issued.
Yes. Section 24-78 sets one flat figure of $25,000. The ordinance has no tiers by job size or contractor type. A separate performance bond under Section 24-136 can be required on top of it, and that amount is set by the county's risk manager.
Contractors and plumbers can. The policy needs at least $25,000 of property damage coverage and $100,000 of personal injury coverage, must include products hazard coverage including completed operations liability, and must omit the C.D.U. exclusions. A copy has to be filed with the Macon-Bibb County clerk. If any piece is missing, the policy does not qualify and you need the bond.
No. Section 24-68 requires a permit from the Macon-Bibb County engineer before anyone, franchisees included, disturbs a street or sidewalk surface. The bond or qualifying policy is in addition to that permit.
Macon-Bibb County. The ordinance says the bond is given to Macon-Bibb County and must protect the county against damage to person or property arising from the work.
You pay a premium, not the $25,000. The surety sets the rate after looking at the owner's credit and the company's track record. Better credit usually means a lower premium.
The county code does not state a bond filing fee, bond term or renewal date. Check with the Macon-Bibb County Engineering Department before filing.
This website is a referral and marketing platform that connects users with licensed insurance agents. We do not issue surety bonds directly except in states where we are licensed. All bond applications are processed and fulfilled by licensed agents. By using this site, you agree to our Terms & Conditions, Privacy Policy, and the use of cookies. If you do not agree, please exit the site.