The Georgia DOT bond amount is not one number. It comes off a table keyed to the posted speed limit, the number of turn lanes and whether the road is curbed, and a new signal adds $120,000 on its own. Know your row before you order the bond and the permit is not held up for a rider.
The Georgia Department of Transportation requires a performance bond or letter of escrow from every applicant for a commercial driveway or special encroachment permit on the state highway right of way. The amount is set by Table 2-1 of GDOT's Regulations for Driveway and Encroachment Control, from a $40,000 minimum up to $170,000 per driveway, plus $120,000 for a new traffic signal or $60,000 for a signal modification. The bond is released once the work is completed to the inspector's satisfaction.
We can help with all Georgia bonds!
GDOT sets the bond from estimated construction cost using Table 2-1 of the Regulations for Driveway and Encroachment Control. Three things decide your row: the posted speed limit, whether you are building one turn lane or two, and whether the road is urban (curb and gutter) or rural (paved or graded shoulders). The minimum bond amounts are:
35 mph or less: $40,000 rural or $60,000 urban with one turn lane, $70,000 rural or $90,000 urban with two.
40 to 45 mph: $50,000 rural or $70,000 urban with one turn lane, $100,000 rural or $120,000 urban with two.
50 to 55 mph: $60,000 rural or $80,000 urban with one turn lane, $120,000 rural or $140,000 urban with two.
60 mph or more: $70,000 rural or $90,000 urban with one turn lane, $150,000 rural or $170,000 urban with two.
Add $120,000 if the project installs a new traffic signal, or $60,000 to modify an existing one. With multiple driveways, the amounts for each drive are added together. The District Engineer can raise the amount. Where a Special Encroachment Permit involves no turn lanes, the bond is half the minimum amount, or more depending on the scope of work as determined by the Traffic Operations Manager.
Under Section 2.2 the bond assures that the permitted work is built in accordance with the approved permit. If the applicant does not comply, GDOT uses it to pay for correcting or removing incomplete or unauthorized work and to cover damages the Department or others suffer from the work. The regulations cite Georgia Code 32-6-51 and 32-6-133 as authority.
The bond must name the owner or entity applying for the permit. Applications are accepted from the property owner, a lessor under a lease of at least three years, an official of the owning organization, or a developer holding a development agreement signed by every affected property owner. When a site is developed for more than one owner under a development agreement, the bond must be in the developer's name. GDOT's special encroachment chapter notes that local and city governments may be exempt from bond requirements.
Blanket performance bonds are accepted, sized from Table 2-1 and the number of permits you expect to request statewide during the bond period. GDOT also accepts a letter of credit in a format it has preapproved, available from the District Operations Engineer. The surety does not have to be based in Georgia.
All bonds, insurance and other requirements must be submitted before the permit is issued. Once the completed bond is furnished, the Area Engineer issues the approved permit plans and permit poster. Work must be completed within 12 months of approval, and the bond is released after the inspector accepts the finished work.
Premium is charged on the bond amount from your Table 2-1 row. The surety prices it on the principal's credit, financial statements for larger amounts, and experience with similar roadway work.
It depends on the road. A single turn lane on a rural road posted 35 mph or less starts at $40,000. The same driveway on an urban road posted 60 mph or more starts at $90,000. Two turn lanes, signals and extra driveways raise it from there.
Yes. GDOT accepts blanket performance bonds sized from Table 2-1 and the number of permits you expect to request statewide during the period the bond covers.
The bond is half the minimum bond amount, or higher depending on the scope of work as determined by the Traffic Operations Manager.
After the work is completed to the satisfaction of the GDOT inspector and the project is accepted. Work must be finished within 12 months of permit approval.
GDOT states that local and city governments may be exempt from bond requirements. Private owners, lessors and developers post the bond.
This website is a referral and marketing platform that connects users with licensed insurance agents. We do not issue surety bonds directly except in states where we are licensed. All bond applications are processed and fulfilled by licensed agents. By using this site, you agree to our Terms & Conditions, Privacy Policy, and the use of cookies. If you do not agree, please exit the site.