Have a question?
+1 815-826-6324 (815-8-BondAI)
phil@AmericasSuretyBonds.com
Army Veteran Owned | Expert Surety Bonds Since 2004
Broward County will not issue a permit for work in its right-of-way until the required performance and maintenance security is posted. Getting the security in place early keeps a road cut, utility crossing or driveway job from sitting idle waiting on the permit.
Contractors working in public right-of-way under Broward County jurisdiction must post performance and maintenance security with the Highway Construction and Engineering Division before the permit is issued. The Division sets the amount using rates approved by the Board of County Commissioners, and the security stays in place for one year after the County accepts the work.
We can help with all Florida bonds!
The County's published minimum standards for right-of-way work, Exhibit 25A to the Broward County Administrative Code, list cash, certified checks and irrevocable letters of credit as the accepted forms of performance and maintenance security. Before you order a surety bond, ask the Highway Construction and Engineering Division whether a bond is accepted for your permit and on what form. That one call avoids a rejected filing.
Under Section 3-2.1 of the standards, construction in public right-of-way under County jurisdiction needs a permit, and the Division issues those permits only to a licensed contractor. Section 4-1.8 says the permit is issued only after the required performance and maintenance security has been posted. A change of contractor midway requires a new permit before work continues.
Section 5-2.2 waives security for a residential driveway connection built by the owner or the owner's contractor, serving a single family or duplex residence, with one driveway no wider than 18 feet. Minor maintenance work and emergency repairs have their own rules under Sections 3-2.1.1 and 3-2.3.
There is no single figure. Section 4-3.1 says security amounts are set by the Division based on rates and conditions approved by the Board of County Commissioners. Water and sewer, telecommunications, electric power, landscaping and monitoring wells each have their own security sections.
Maintenance security remains in effect for one year after the permitted work is accepted. Letters of credit must cover that same period and require at least 30 days' notice before cancellation.
The Highway Construction and Engineering Division sets it based on rates and conditions approved by the Board of County Commissioners. It varies with the type and size of work.
Not for a single driveway up to 18 feet wide serving a single family or duplex home, built by the owner or the owner's contractor. Section 5-2.2 of the minimum standards waives it.
The published standards list cash, certified checks and irrevocable letters of credit. Confirm with the Division whether a surety bond is accepted for your permit before you buy one.
Maintenance security stays in effect for one year after the County accepts the permitted work.
This website is a referral and marketing platform that connects users with licensed insurance agents. We do not issue surety bonds directly except in states where we are licensed. All bond applications are processed and fulfilled by licensed agents. By using this site, you agree to our Terms & Conditions, Privacy Policy, and the use of cookies. If you do not agree, please exit the site.
All Florida Right of Way bonds · All Broward County, FL bonds · All Florida surety bonds