One bond covers both Westport permits. The Town's Permit Bond form names the Sanitary Sewer Connection Permit and the Road Opening Permit together, so a contractor tying a house into the sewer through the street files a single bond with Public Works instead of two.
The Town of Westport Department of Public Works requires a permit bond before it issues a Sanitary Sewer Connection Permit or a Road Opening Permit. This listing is written at $25,000. The Town's published Permit Bond form is set at $10,000 and its requirements sheet asks for not less than $10,000, so confirm the amount Public Works wants on your bond before it is issued.
We can help with all Connecticut bonds!
The point most applicants miss is the amount. The Westport Permit Bond form posted by the Department of Public Works binds the principal and surety to the Town in the sum of $10,000, and the Application Requirements sheet calls for a bond in an amount not less than $10,000 with the expiration date noted. This listing is for a $25,000 bond, which is above that minimum. Ask Public Works which figure applies to your work and match it exactly.
The bond guarantees the Town of Westport that the permit holder will perform work under a Sanitary Sewer Connection Permit, to connect to the Town owned sewer system, or a Road Opening Permit, to excavate in Town streets and sidewalks, and restore what is disturbed. If the contractor fails to do so, the Town can claim against the bond.
Sewer connection applicants must include a copy of a Connecticut plumbing license in class P1, P2, P6, P7, W8 or W9. Existing septic tanks must be pumped, crushed and backfilled before final approval. A sketch of the proposed work must accompany the application, and a separate Tree Warden permit is needed before any tree is removed. The permit fee is $125.
Insurance naming the Town of Westport as additional insured is also required: general liability of $1,000,000 per occurrence and $2,000,000 aggregate, automobile liability of $1,000,000 per accident, umbrella coverage of $1,000,000, and workers' compensation meeting Connecticut statutory requirements.
A Road Opening Permit is valid for 60 days and can be extended once for another 60 days. The sewer connection requirements call for the work to be completed within 90 days.
The Town's requirements sheet sets $10,000 as a minimum, not a cap. This listing is written at $25,000. Public Works decides the amount it accepts, so confirm it before the bond is issued.
The Westport Permit Bond form covers both the Sanitary Sewer Connection Permit and the Road Opening Permit. Confirm with Public Works whether one bond satisfies both permits for your project.
60 days from issue, with one extension of another 60 days available.
The application requires a copy of a Connecticut plumbing license in class P1, P2, P6, P7, W8 or W9.
This website is a referral and marketing platform that connects users with licensed insurance agents. We do not issue surety bonds directly except in states where we are licensed. All bond applications are processed and fulfilled by licensed agents. By using this site, you agree to our Terms & Conditions, Privacy Policy, and the use of cookies. If you do not agree, please exit the site.