Montville will not issue your zoning permit until the erosion and sediment control bond the Planning and Zoning Commission set for your project is posted. A surety bond lets you meet that condition with an annual premium instead of tying up cash in a town account until the site is stabilized.
The Town of Montville requires an erosion and sediment control bond as a condition of many site plan, subdivision and special permit approvals. There is no single town wide figure. The Planning and Zoning Commission sets the amount for each project, it must be posted before the zoning permit is issued or construction starts, and it is released only after town staff inspect the site and confirm it is stabilized.
We can help with all Connecticut bonds!
The most common mistake on this bond is assuming Montville has one fixed amount. It does not. The Planning and Zoning Commission writes the bond amount into the conditions of approval for each application, based on the erosion and sediment controls shown on your plans. Commission records show how much this varies. In 2009 the Commission required a $2,000 bond for a site plan on Maple Avenue, $2,000 per lot for a 14 lot subdivision on Old Colchester Road, $2,500 for one Platoz Drive building, and later released a $42,850 erosion and sedimentation bond on a larger development. Your number is the one in your own approval letter.
The Montville Zoning Regulations require a Soil Erosion and Sediment Control Plan, defined as a plan and narrative conforming to the Connecticut Guidelines for Soil Erosion and Sediment Control 2002. The regulations address the plan in Section 15.1 and project security in Section 15.4. The bond guarantees the town that silt fence, sediment basins, stabilized construction entrances and the other measures on your plan will be installed, maintained and kept in place until the disturbed ground is stabilized. If the work is abandoned or the controls fail, the town can draw on the bond to do the work itself.
Commission conditions typically require the bond to be posted prior to issuance of a zoning permit, and for subdivisions it may be required for each lot before construction starts on that lot. Release is a separate request to the Commission. Staff inspect the site, and once it is stabilized the Commission votes to release the bond. Keep the bond in force until that vote.
Confirm the exact amount, the obligee wording and whether the town accepts a surety bond form for your project with the Montville Land Use office before the bond is issued. A larger project may also carry a separate performance bond for public improvements, which is a different instrument from this one.
It depends on your project. The Planning and Zoning Commission sets the amount in your conditions of approval. Past approvals have ranged from $2,000 for a single site to $42,850 for a larger development, and some subdivisions require a set amount for each lot.
Before the zoning permit is issued, or for subdivision lots before construction starts on the lot, as stated in your approval conditions.
Ask the Planning and Zoning Commission for release. Town staff inspect the site, and once it is stabilized the Commission votes on the release.
No. Montville can require a separate performance bond for public improvements on a subdivision. The erosion and sediment control bond covers only the temporary controls and site stabilization.
The surety prices it from the bond amount and the principal's credit and financial strength. Larger amounts or weaker credit may call for financial statements.
This website is a referral and marketing platform that connects users with licensed insurance agents. We do not issue surety bonds directly except in states where we are licensed. All bond applications are processed and fulfilled by licensed agents. By using this site, you agree to our Terms & Conditions, Privacy Policy, and the use of cookies. If you do not agree, please exit the site.