Have a question?
+1 815-826-6324 (815-8-BondAI)
phil@AmericasSuretyBonds.com
Army Veteran Owned | Expert Surety Bonds Since 2004
Shelton will not issue a street excavation permit to a contractor until the bond is in place, so this $10,000 bond is usually the item that decides whether a crew starts on schedule. It is an annual premium, not cash tied up with the city, and once it is issued the permit application moves forward through the city's online system.
The City of Shelton requires an excavation permit for any work inside a city highway right of way, including utility services, sewer connections, sidewalks, curbs and driveways. Contractors post a $10,000 street excavation bond with the city. Public utilities that comply with Connecticut General Statutes 16-230 are exempt from the bond. Permits are filed online and are valid for 90 days.
We can help with all Connecticut bonds!
Shelton regulates digging in city streets under Chapter 14, Article II of its Code of Ordinances, the street excavation article, along with Ordinance 791. The City Engineer's office states that any work within a city highway right of way requires an excavation permit. That covers utility mains and building services, sanitary sewer building connections, public sidewalks and curbs, and driveways in the right of way. The contractor doing that work posts the $10,000 bond in favor of the City of Shelton.
Utility companies that comply with Connecticut General Statutes 16-230 are exempt from posting the bond under Section 14-53, and from the permanent patching fee. That exemption belongs to the utility itself. A private contractor hired to install a water service, sewer lateral or driveway apron still needs its own bond.
The bond backs the contractor's promise to perform the work and restore the street as the ordinance requires. Shelton also charges each permittee a separate fee for the cost of the permanent pavement repair under Section 14-60, so the bond is not a substitute for that fee. Violations can bring fines of up to $250 each under Section 14-62, plus the city's cost to correct unsafe conditions, and the Director of Public Works can revoke a permit for just cause.
A Shelton excavation permit is valid for 90 days from issue. If the job slips past that window, plan on a new permit and make sure the bond is still in force. Confirm the current bond form and any filing steps with the Engineering Department before the bond is issued.
No. The Section 14-53 exemption applies to utility companies that comply with CGS 16-230. A private contractor pulling its own excavation permit in Shelton posts its own $10,000 bond.
Not in place of the fee. Shelton charges every permittee a fee for the cost of the permanent repair, based on the repair area. The bond stands behind your obligations under the ordinance, and the patch fee is billed separately.
Ninety days from the date it is issued. Plan the job around that window.
Shelton handles engineering permits online through its OpenGov portal. The Engineering Department is on the third floor of City Hall at 54 Hill Street and can be reached at (203) 924-1555 ext. 1509.
This website is a referral and marketing platform that connects users with licensed insurance agents. We do not issue surety bonds directly except in states where we are licensed. All bond applications are processed and fulfilled by licensed agents. By using this site, you agree to our Terms & Conditions, Privacy Policy, and the use of cookies. If you do not agree, please exit the site.
All Connecticut Excavation bonds · All City of Shelton, CT bonds · All Connecticut surety bonds