A solar decommissioning bond is usually the last thing a permitting office wants before it lets a project break ground. It promises the landowner, county or agency that the panels, racking and wiring will come out and the land will be put back when the project ends. A surety bond does that for an annual premium, so the cash that would otherwise sit in an escrow account stays in the project.
Solar decommissioning bonds are posted by developers and owners of solar facilities to guarantee removal of equipment and reclamation of the site at the end of the project's life. The obligee is whoever required the bond, often a county, state agency, landowner or, on federal land, the Bureau of Land Management. Amount and wording come from that obligee's permit or lease, so confirm the current form and filing steps with them before the bond is issued.
We can help with all All States bonds!
How to Apply for a Propeller Solar Decommissioning Program Bond Bond:
- The permit, lease or right of way grant that calls for the bond, showing the required amount and obligee.
- The decommissioning or reclamation cost estimate the obligee approved, if one was prepared.
- Legal name of the project owner exactly as it appears on the permit or grant.
- Financial statements for the owner or parent company for underwriting.
- Any bond form the obligee prescribes, or its required bond wording.
- Payment of the premium, then delivery of the signed bond to the obligee before the construction deadline.
Detailed Information About the All States Propeller Solar Decommissioning Program Bond Bond:
What the bond guarantees
A solar project eventually stops producing. The decommissioning bond guarantees that when it does, the owner will pull the modules, racking, inverters, cabling and foundations, dispose of them properly and restore the ground. If the owner walks away instead, the obligee can claim against the bond to pay for the work. The surety then looks to the owner to repay it.
Who sets the amount
There is no single national figure. The amount is set by the authority that required the bond. Counties and states usually tie it to an engineer's decommissioning cost estimate in the permit. Private landowners write it into the lease. Use the amount and bond form your permit or lease calls for.
Projects on federal land
For solar on Bureau of Land Management land, 43 CFR 2805.20 governs. The BLM must review and accept a performance and reclamation bond before any land disturbing work starts and before it issues a Notice to Proceed. For a solar grant outside a designated leasing area, the amount is based on a reclamation cost estimate and must be no less than $10,000 per acre that will be disturbed. The estimate has to cover hazardous materials and other environmental liabilities, removal and disposal of the facilities, and interim and final reclamation including revegetation and soil stabilization. Solar leases inside designated leasing areas are bonded under a separate subpart. The BLM reviews the bond periodically and can require an increase at any time during the grant.
How release works
On federal grants you notify the BLM once reclamation is done and ask it to reevaluate the bond. It may release all or part of the bond after it confirms the work is complete. Local permits usually follow a similar sign off by the county or the landowner.
Eligibility and Requirements for an All States Propeller Solar Decommissioning Program Bond Bond:
- Bond amount matching the obligee's approved cost estimate or permit condition.
- For BLM solar grants outside designated leasing areas, at least $10,000 per disturbed acre under 43 CFR 2805.20.
- Bond accepted before ground disturbance or a Notice to Proceed.
- Periodic review, with the obligee able to require a higher amount as costs change.
- A surety acceptable to the obligee. Federal obligees generally require a Treasury listed surety.
All States Propeller Solar Decommissioning Program Bond Bond FAQs:
Whatever the permit, lease or grant requires. Most local governments base it on a decommissioning cost estimate. On BLM land, a solar grant outside a designated leasing area needs at least $10,000 per disturbed acre, or more if the reclamation cost estimate is higher.
Before construction. The BLM will not approve ground disturbing work or issue a Notice to Proceed until it has reviewed and accepted the bond. Counties typically tie it to the building or conditional use permit.
Yes. Under 43 CFR 2805.20 the BLM periodically reviews the bond and can require an increase or allow a decrease. Many county permits also call for the cost estimate to be updated on a schedule.
The surety looks at the bond amount, the owner's financial strength and the length of the obligation. Decommissioning bonds can run for decades, so balance sheet strength matters more here than on most bonds.